Success through synergy

Just in Time - Fit for use

Streamlined process

More efficient
more effective

Clearlight deeply integrates the installation process into its own assembly process. In this way, the number of operations in the overall process are minimized. For example, consider specially packaging the lamps by room to save packaging materials and handling.

The desired cable length with the desired fastening mechanism can be mounted to each lamp. This makes real-life connecting a piece of cake!

This reduces the total cost of realization to the absolute minimum. Clearlight can also take care of the entire realization.

“Clearlight contributes to making the process as efficient as possible. In doing so, it achieves synergy benefits that are not normally possible.”

Just in time

Save resources through precise delivery

Delivered exactly at the right time

Advantages:

  1. There is no on-site storage
  2. No need for storage insurance
  3. There is no waste of space
  4. Less waste is generated
  5. The probability of disruptions is minimal

Benefits explained

By perfectly coordinating delivery and installation work, there are fewer operations. Is there less waste, reduces the risk of disruptions and eliminates the need for storage space. Because nothing needs to be stored on site, no insurance is required either.

Our lamps are delivered with the desired connection mechanism and cable length directly from the special packaging box. This box will, of course, be reused. This makes installation extremely effective because no time is lost in searching for lamps, matching them together and fitting the right cords and plugs.

"Clearlight installs-where the situation allows-with people distanced from the labor market"

Fit for use

Install directly

In its standard range, Clearlight supplies right-angle ground connectors and Wieland GST18i3 with 1.5m1 connection cord. Departures from this length can be made upon request. Because Clearlight has its own assembly process, alternative connection plugs can be mounted as required. As a result, there is no wasted time in assembling connecting leads, or in searching for the right products. Thanks to Fit for use delivery, considerable savings are made on the total number of different items. This creates a more manageable flow of goods and a more efficient process.

Our motto is “Out of the packing box directly into the ceiling.”

01

Lighting Plan

Clearlight develops the lighting plan from A to Z. In addition, Clearlight can also work from existing lighting plans.

02

Installation Plan

From the lighting plan, the installation plan emerges. At this stage, the desired installation sequence is discussed in consultation with the executing party.

03

Implementation

Based on a tight schedule, scheduled deliveries are made at scheduled locations. This can even be done at the room level. Clearlight can also handle the execution. As much as possible with employees with a distance from the labor market.

Contact us today

“Free to explore options”

Case study example

Realization

In the introductory meeting, the wishes and requirements regarding the light and in the installation are established. Based on this, Clearlight further develops the lighting plan. Upon approval of the lighting plan, the frameworks of installation plan are further developed and the executing party must establish time blocks for deliveries.

Advantages